Table 3 Comparison of net tie-line power flows in the original network and those in GSF and AED-based equivalent networks obtained using Algorithm 3 for 300 bus system

From: A network science-based k-means++ clustering method for power systems network equivalence

Case no.

Tie-line combination

Original network

GSF-based equivalent network

AED-based equivalent network (Algorithm 3)

Flow (MW)

Flow (MW)

% deviation

Flow (MW)

% deviation

Case 1

TL19–87/TL8–14

448.09

375.31

16.24

392.85

12.33

Case 2

TL19–87/TL4–16

1051.79

1019.24

3.09

1032.31

1.85

Case 3

TL19–87/TL62–144

55.34

156.84

183.41

57.93

4.68

Case 4

TL8–14/TL62–144

450.86

391.79

13.10

487.01

8.02

Case 5

TL4–16/TL62–144

994.46

490.70

50.66

973.19

2.14